S773L N843 N843L Service Manual 109823 0209 - Free download as PDF File (.pdf).2 Marko Buliæ TECHNICAL CALCULATION AND ESTIMATOR'S MAN-HOUR MANUAL ERECTION OF PROCESS OR CHEMICAL PLANTS I. Shibaura Diesel Engine,Operation Manuals E673L,S773L,N843,N843L,N844L. PDF Piping Calculations Manual Mery Xmast.1 TECHNICAL CALCULATION AND ESTIMATOR'S MAN-HOUR MANUAL Marko BuliæDevelopment of calculation methodologies for the design of piping systems Jo&227 o Pedro Amaral Vidigal da Silva Mechanical Engineering Department, Instituto Superior T&233 cnico, Lisboa, Portugal e-mail: joaovidigalist.utl.pt Abstract - Piping systems are constantly present in industrial facilities, being in some cases associated with the transport of fuels and steam at very high temperatures. There are a high number of different components in each piping system: elbows, straight pipe, reducers, valves, flow meters, thermowells, pressure taps, branch connections, flanges, gaskets, bolts, etc.Download Piping And Pipeline Calculations Manual Piping And Pipeline Calculations Manual tutorial Mobile online. Pipe thickness is within 1 to 2 of nominal at any welded joints, the actual wall thickness may be 12.5 different than expected.

piping calculations manual pdf

COMPLETE MANUAL (239 pages) US$ 600 US$ EACH CHAPTER I PIPING ABOVE GROUND - 36 pages + 20* US$ 180 US$ 300 II PIPELINES - 7 pages + 20* US$ 75 US$ 120 III STEEL STRUCTURES - 7 pages + 20* US$ 80 US$ 130 IV PROCESS EQUIPMENT - 10 pages + 20* US$ 70 US$ 110 V STORAGE TANKS - CYLINDRICAL & SPHERICAL - 11 pages + 20* US$ 80 US$ 130 VI WELDING AND FLAME CUTTING - 18 pages + 20* US$ 75 US$ 120 VII CORROSION PROTECTION - 3 pages + 20* US$ 35 US$ 55 VIII THERMAL INSULATION - 3 pages + 20* US$ 35 US$ 55 IX ESTIMATES - 11 pages + 20* US$ 100 US$ 165 X PIPING ABOVE GROUND - ESTIMATE POINTS FOR BUILD-IN ITEMS - 76 pages + 20* US$ 130 US$ 215 XI WEIGHT FACTORS - 7 pages US$ 15 US$ 25 XII XIII XIV TECHNICAL CALCULATION MANNER OF DATA COMPILING - 4 pages US$ 6 US$ 10 MANHOURS FOR OVERHAULS IN PETROCHEMICAL PLANTS - 16 pages + 20* US$ 80 US$ 130 FACTORS AND MANHOURS FOR PIPING AND STEEL STRUCTURE WORKS IN CALL FOR TENDERS OF TECHNIP COMPANY - 3 pages + 20* US$ 60 US$ 100 NOTE: +20* = THE FIRST 13 PAGES OF THE MANUAL AND 7 PAGES OF THE APPENDIX 3. 3 Thank you for showing interest in buying our book TECHNICAL CALCULATION AND ESTIMATOR'S MANHOURS MANUAL You can buy the electronic version of the Manual containing all the figurest and other related data at the following prices: Individuals Legal entity 1. B16.38 Large Metallic Valves for Gas. B16.37 Hydrostatic Testing of Control Valves. B16.33 Manually Operated Metallic Gas Valves for Use in Gas Piping systems Up to 125 psig (sizes ½ through 2) B16.34 Valves Flanged, Threaded and Welding End. This book, or parts thereof, may not be reproduced in any form without permission of the author.1.1 Definition of Piping Pipe is a pressure tight cylinder used to convey a fluid or to transmit a fluid pressure.

A short summary of this paper. 1Download Full PDF Package. We congratulate you on your choice and thank you for buying our electronic Manual. As soon as your payment is received we shall send you the password that will enable you to open and use the e-manual. We shall send you the electronic manual immediately. Please, us your full address and indicate the purchase option you have decided for.

Since 1978 with occasional interruptions because of simultaneous involvement in several different projects, I worked mostly on technical calculations. Andi 4 PREFACE All 40 years of my working life, I spent on erection of different process plants most of which were oil industry projects in the country and abroad, in Europe and North Africa. Mechanical Estimating Manual. Mechanical Estimating Manual.

It is not easy to present exact technical figures and quantities for the equipment or operations not fully defined, hard to comprehend, or even unknown to the estimator. Very often tenders were not complete and not detailed enough, and the time required for a good technical calculation is getting every day shorter. I am fully aware of the problems an estimator encounters when working on technical calculations for specific technologies. The tenders were written in various foreign languages and alphabet, even in Cyrillic.

I surveyed the results and analyses of as-built designs. A great deal of that was verified in practice during the plant erection. I have made the analyses, comparisons, simulations, new measures, and manhour tables. That was the reason for collecting various technical bibliography, standards, catalogues, man hours and rates from the European and USA countries. Enormous experience is needed, an ability to assess and estimate, and even the courage to write down the technical quantities and figures.

It is important to understand that there are no identical projects or jobs in this business, that each project is specific and that no automatism or copying is possible. Finally, I decided to write this manual for discriminative estimators. Too many things collected on too many places.

A saying Switch on your brain before switching on the computer should be followed. Only when the relevant man hours are estimated and selected, a computer can be used. An estimator himself must choose the values and define the man hours taking into account all the elements that might have any influence on them. Those are the people, which instead of using a computer, a computer uses them. Many people try to include the man hours from the tables into the computer systems, which I oppose.

piping calculations manual pdf

VALVES VALVES WITH FLANGED ENDS VALVES WITH WELDING ENDS VALVES FOR THREADED ENDS PRESSURE GAUGES THERMOMETERS.34 RATES FOR TENDER CALCULATIONS MANHOUR ESTIMATE FOR INSTALLATION OF PIPING EFFECT ASSESSMENT FOR QUICK CALCULATION PIPING IN PROCESS PLANT PIPES (CARBON STEEL - NOT INSULATED) - MEAN VALUE FITTINGS (CARBON STEEL) - MEAN VALUE VALVES - MEAN VALUE PIPE SUPPORTS AVERAGE DIAMETER - Manner of Calculation RATES FOR INSTALLATION OF POLYETHYLENE PIPING RATES FOR ERECTION OF PVC & FRP PIPING CARBON STEEL PIPING CEMENT LINED INSIDE PIPING MADE OF STEEL AND GREY CAST-IRON RATES FOR PIPING BASED ON INCH-DIAMETER (ID) RATES FOR UNITS OF OPERATION - BASED ON INCH-DIAMETER (ID) RATES FOR PIPING WELDING MAN HOURS FOR WELDING OF PIPING WORK CALCULATION - MAN HOURS FOR PIPING MODIFICATION AT SITE INSTALLATION OF PIPING ABOVE - GROUND Prefabrication and installation breakdown.49 CHAPTER II. 16.9) ELBOWS CAPS TEES STRAIGHT TEE REDUCED TEE REDUCERS - CONCENTRIC AND ECCENTRIC PIPES (DIN 2448/2458) PIPE - INSTALLATION IN PROCESS PLANT PIPE - INSTALLATION ON PIPE RACK OR SLEEPER WAY STEAM TRACING (ANSI & DIN) INSTRUMENT AND CONTROL PIPING STEAM DISTRIBUTORS AND CONDENSATE COLLECTORS FABRICATED FROM PIPES AND FITTINGS STEAM DISTRIBUTORS AND CONDENSATE COLLECTORS FABRICATED FROM READY MADE DISTRIBUTORS FOR 4 CONNECTIONS FITTINGS (DIN) ELBOWS CAPS TEES REDUCERS - CONCENTRIC AND ECCENTRIC FLANGES WELDING NECKS SLIP - ON SOCKET WELDING LAP JOINT + STUB END BLIND ORIFICE COMPLETE SMALL FITTINGS WELDOLETS, SOCKOLETS, NIPOLETS, etc HALF COUPLINGS FOR WELDINGS FITTINGS WITH SOCKET ENDS THREADED FITTINGS6 5. PIPES (ANSI B ) PIPE - INSTALLATION ON PROCESS PLANT PIPE - INSTALLATION ON PIPE RACK OR SLEEPER WAY FITTINGS (ANSI B. PIPING ABOVE GROUND.14 DERIVED OPERATING TIME STANDARD FOR TABLES FACTOR OF BASIC ASSEMBLY 1. Marko Buliæ Zagreb Croatia,5 CONTENTS page PREFACE.2 INTRODUCTION.11 ABBREVIATIONS & UNITS.13 CHAPTER I. A complete edition of this manual in the Croatian language and its sections were published in 1997 and This is why I have not given a unified percentage of the production efficiency but each chapter has its own.

ERECTION OF EQUIPMENT IN PETROCHEMICAL INDUSTRY STATIONARY EQUIPMENT ALL EQUIPMENT TO 0,5 TON TOWERS above 0,5 TON TOWERS CONSISTING OF MORE PIECES PACKAGE UNIT OTHER EQUIPMENT BRIDGE CRANES LIFTS ELECTROSTATIC PRECIPITATORS MARINE LOADING ARMS ROTARY EQUIPMENT CENTRIFUGAL PUMPS MAN HOURS BASED ON POWER MAN HOURS BASED ON WEIGHT MAN HOURS BASED ON THE CAPACITY COMPRESSORS COMPRESSORS DRIVEN BY ELECTRIC MOTOR COMPRESSORS DRIVEN BY GAS TURBINE8 3. TO THE WEIGHT MISCELLANEOUS STRUCTURES REMOVAL OF STEEL STRUCTURE AND MISCELLANEOUS ITEMS.66 CHAPTER IV. STEEL STRUCTURE ERECTION BASIC MAN HOURS - UNIT SORTING THE STRUCTURE PRE-ERECTION OF STRUCTURE TRANSPORT OF STRUCTURE TO ERECTION PLACE INSTALLATION OF ANCHOR BOLTS STRUCTURE ERECTION INSTALLATION OF LOST FORMWORK INSTALLATION OF WIRE ROPE CLAMPS REAMING OF HOLES BOLTING FROM SCAFFOLDING ERECTION OF MISCELLANEOUS STEEL STRUCTURES BASIC MANHOUR RATES CORRECTION FACTORS STEEL STRUCTURES IN OIL REFINERIES AND PETROCHEMICAL PLANTS LIGHT STRUCTURE (to 30 kg/m) MEDIUM-WEIGHT STRUCTURE (31 60 kg/m) HEAVY STRUCTURE (above 60 kg/m) MISCELLANEOUS STRUCTURES PIPE HANGERS AND SUPPORTS ERECTION AND DISMANTLING OF MISCELLANEOUS STEEL STRUCTURES ERECTION OF STEEL STRUCTURES - ACC.